Blogs

How Long Does It Take to Renovate the Inside of a House?

Before beginning a remodel, one of the most common homeowner questions is “How long will it take?

Knowing realistic timetables is crucial if you intend to remodel the interior of your home, whether it’s a kitchen makeover, bathroom renovation, or a whole makeover. Depending on the extent of the work, the condition of the house, and the quality of the project’s planning, house renovation timelines can vary significantly.

We have assisted homeowners with hundreds of interior improvements at Extend A Home. In this tutorial, we’ll break down how long interior renovations typically take, what factors affect the timeframe, and how you can avoid delays.

The Short Answer: How Long Do Interior Renovations Take?

There’s no one-size-fits-all response, but as a general guide:

  • Small interior renovations: 2–6 weeks
  • Medium internal renovations: 6–12 weeks
  • Full internal house renovations: 3–6+ months

Searches like “how long does an internal renovation take” often boil down to scope, complexity, and planning — not just the build itself.

What Counts as an Internal House Renovation?

An internal renovation can include one or more of the following:

  • Kitchen renovations
  • Bathroom renovations
  • Laundry improvements
  • Flooring replacement
  • Internal wall modifications
  • Electrical and plumbing upgrades
  • Painting and finishing
  • Complete reworking of the internal layout

The more trades involved, the longer the renovation timeline.

house renovation timeline

House Renovation Timelines by Project Type

Kitchen Renovation Timeline

A kitchen remodel normally takes 4–8 weeks, depending on the intricacy.

Typical stages include:

  • Demolition: 2–5 days
  • Rough-in plumbing and electrical: 1–2 weeks
  • Cabinet installation: 1 week
  • Benchtops, appliances, finishes: 1–2 weeks

Custom cabinetry or stone benchtops can add time due to manufacturing lead times.

Bathroom Renovation Timeline

Bathroom renovations normally take 3–6 weeks.

Key stages:

  • Demolition and waterproofing: 1 week
  • Plumbing and electrical rough-ins: 1 week
  • Tiling: 1–2 weeks
  • Fit-off and finishing: 1 week

Waterproofing and curing processes cannot be hurried since bathrooms require a lot of attention to detail. 

Flooring Replacement Timeline

Replacing flooring across a house might take 1–3 weeks, depending on:

  • Flooring type (carpet, tiles, hybrid, and wood)
  • Floor preparation is necessary.
  • If moving furniture is necessary

Full Internal Renovation Timeline

A full internal house remodelling normally takes 3 to 6 months, occasionally more for intricate projects.

This often includes:

  • Structural changes
  • Multiple wet areas
  • New flooring throughout
  • Electrical and plumbing upgrades
  • Custom joinery

This is where professional project management makes the biggest difference.

What Affects How Long an Interior Renovation Takes?

1. Scope of Work

The biggest factor is how much you’re changing.

  • Cosmetic updates = faster
  • Structural or layout changes = longer

Knocking down walls, relocating pipes, or rewiring an entire property takes significant time. 

2. Planning and Design Phase

The length of pre-construction planning is often underestimated.

Before construction ever starts, design, selections, approvals, and scheduling can take 4 to 8 weeks, but this stage is crucial to preventing delays later.

3. Approvals and Compliance

Approvals are needed for certain internal improvements, particularly if they include:

  • Structural changes
  • Load-bearing walls
  • Fire or safety compliance

At Extend A Home, we factor in approval time into the overall project timetable from the outset.

  1. Availability of Materials

Supply delays are a common cause of renovation blowouts.

Items that can affect timelines include:

  • Custom cabinetry
  • Stone benchtops
  • Imported tiles or fixtures
  • Specialty lighting

Early selections and ordering help keep projects on schedule.

5. Trades and Scheduling

Internal renovations rely on numerous trades operating in the precise sequence.

Poor coordination can add weeks to a project. Professional builders organise trades to reduce downtime and overlap.

6. Living in the Home During Renovation

If you’re living in the house while renovating, timelines may extend slightly due to:

  • Limited work hours
  • Staged construction
  • Safety considerations

We help homeowners plan around this to reduce disruption.

Typical Internal Renovation Stages (And Timeframes)

Here’s a simplified breakdown of a full internal house renovation timeline:

  1. Design & Planning: 4–8 weeks
  2. Demolition: 1–2 weeks
  3. Structural & Rough-In Work: 2–4 weeks
  4. Internal Linings & Flooring: 2–3 weeks
  5. Joinery, Kitchens & Bathrooms: 2–4 weeks
  6. Finishes & Fit-Off: 2–3 weeks

Each stage builds on the last — delays early can flow through the entire project.

Common Causes of Renovation Delays

Some of the most common reasons internal renovations take longer than expected include:

  • Incomplete design decisions
  • Late material selections
  • Unexpected structural issues
  • Budget changes mid-project
  • Poor project management

Choosing an experienced renovation builder significantly reduces these risks.

How Extend A Home Keeps Renovations on Schedule

At Extend A Home, our renovation process is designed to reduce uncertainty and delays.

Our approach includes:

  • Detailed upfront planning
  • Clear project timelines
  • Early material selections
  • Professional trade coordination
  • Regular communication throughout the build

We don’t just build — we manage the entire renovation journey.

Can You Speed Up an Internal Renovation?

While some factors are outside anyone’s control, you can reduce delays by:

  • Finalising design decisions early
  • Choosing readily available materials
  • Working with an experienced renovation builder
  • Avoiding mid-project changes
  • Planning temporary living arrangements if needed

Preparation is the biggest time-saver.

Is a Renovation Timeline Worth It?

While internal renovations require patience, they often deliver significant benefits:

  • Improved functionality
  • Increased property value
  • Better energy efficiency
  • A home that suits your lifestyle

Understanding realistic timelines helps set expectations and reduce stress.

Final Thoughts: Plan Well, Renovate Once

The true answer to the question, “How long does it take to renovate the inside of a house?” is that it depends, but careful preparation is crucial.

With the right contractor, precise timetables, and expert supervision, an interior remodel can be an easy and enjoyable experience.

Talk to Extend A Home

If you’re planning an internal house renovation and want precise timetables and experienced direction, our team is here to help.

Contact Extend A Home right away to discuss your renovation plans and get realistic timetables from experienced professionals.

Renovation Timeline Disclaimer: Timeframes provided are general estimations only. The size of the property, the extent of the work, and unanticipated circumstances can all affect how long renovations take. Larger internal renovations may take longer than usual timelines.

Request a Call Back

Extend a Home is here to help you build the house of your dreams. Call our trusted renovation experts today to get started.
100 Queens Road. Five Dock. NSW. 2046
PO Box 490 Concord. NSW. 2137







    Read More

    What Our Clients Say

    Project: When the house was renovated by Extend a Home, I felt as if we’d doubled our house size.I just felt this was realy the home the would set us up for the next 10 years. The way they designed and built into it, it felt a lot larger, like we got a lot more bang for the buck than we expected we would

    Trent & Emma

    Project: I feel like I’ve died and gone to heaven in this house.I walk in, and it’s a sense of peace ’cause the openness and the light. It’s like people rent a place like this for their summer holidays and I feel like I’m here.

    Deidre

    Project:
    I felt like my dream had come true. This is a house that we can leave our sons with confidence so it was an investment as much as it was a lifestyle change. With renovating and extending,we’ve got more storage, especially the study and the library. As a handyman myself, I was looking for attention to detail.in the work they did, the quality of the work, so nothing is too hard and it sort of just ran smoothly

    Steve & Jane

    Project:
    When the house was fully renovated, I felt like it was somewhere that I wanted to stay for the rest of my life it really is a friendly home to be proud of, My experience working with Extend a Home was far more pleasant than I ever thought it could be

    Michele & Glen

    Project: When the house was newly renovated by Extend a Home, we fet so happy, we finally got the property that we’d actually envisaged in our minds and that we always wanted. Its delivered everything that we expected and more

    Richard McPartlin

    Project: When Extend A Home extended our home I felt that everything was under control while they are managing the project they know what they are doing and I feel that I’m safe in their hands.We needed the space for our relatives that come over and would like to live in this place a bit longer

    Wilson & Lisa